您要查找的是不是:
- Study and Practice on 265 m~2 Sinter Machine of Baotou Steel Corp. 包钢265m~2烧结机工序优化研究及生产实践
- It bought another secondhand blast furnace and a sinter machine from Arbed in Luxembourg. 它还从卢森堡的一家公司购买了一座二手高炉和一个烧结机。
- In order to reduce sinter machine the nose airplane tail air leak rate,designed the software seal,in agglutinated in the cup carries on the experiment,the effect was remarkable. 为了降低烧结机机头机尾的漏风率,设计了软体密封,在烧结杯中进行试验,效果显著。
- In the suitable distribution condition of sinter mixture, the utilization coefficient of sinter machine would be raised, the solid fuel consumption would be reduced and the strength of sinter ore would be raised in micropellet sinter processing. 在适宜的布料条件下,小球团烧结时采用燃料分加工艺可提高烧结杯利用系数、降低烧结矿固体燃料消耗量并提高烧结矿强度。
- The furnishing and the endmost section of sinter machine automatic supervision and picture analysistaking advantage Of specialist's experience system for Magang the second sinter plant are developed. 研制了马钢第二烧结厂烧结机布料及机尾断面自动监测图象专家分析系统,简要介绍了该系统的应用及硬件和软件主要基本结构及设计方案。
- Based on the measured results of sinter machine leakage in Hangzhou I&S Co. and other sinter plant at home,the main reasons leading to larger deviations between twice measured results was analyzed. 本文根据杭钢烧结厂及国内其它一些烧结厂的烧结机漏风率测定情况,分析了测定结果偏差较大的主要原因。
- waste gas of sinter machine discharge end 烧结机尾烟气
- Sinter machine with heating and press 热压烧结机
- continuous strand sinter machine 带式烧结机
- The machine must break down at this busy hour. 正忙的时候,机器偏偏又坏了。
- The uses of this machine are manifold. 这台机器有多种用途。
- In this paper, the structure and features of several kinds usual end seal in sintering machine was compared. 就国内常见的几种烧结机端部密封装置的结构、特点进行了比较。
- Several failures using ESP at the sintering machine tail are analysed, and the corresponding ways are put forward. 对烧结机机尾电除尘器在使用过程中经常出现的几种故障进行分析,并提出相应的解决方法。
- STUDY ON SINTERING TEST PROPORTIONING HIGH GRADE BRAZILIAN CRUDE ORE AND SERPENTINE IN 300m~2 SINTERING MACHINE OF MAANSHAN IRON & STEEL Co. ,Ltd. 马钢300m~2烧结机配用巴西高品位粗粒粉矿及蛇纹石烧结试验研究
- Air leakage occuring at various Iocations of No. 2 Sintering machine was measured before and affer its intermediate re-pairs. 系统测定了2号烧结机中修前后各部位的漏风情况;
- The reasons of high energy consumption on sintering machine No.2 at Xiangtan I &S Co were discussed from the results of heat balance test. 摘要根据湘潭钢铁公司(以下简称湘钢)2号烧结机能耗现状和热平衡测试结果分析了该烧结机能耗高的原因。
- The comprehensive technical reformation to raise the utilization factor of 1# sintering machine of Xuan Steel is introduced as well as its good effect. 介绍了宣钢一烧1%23烧结机提高烧结机利用系数的综合技术改造措施,改造后取得了较好效果。
- The reasons of high energy consumption on sintering machine No.2 at Xiangtan I&S Co were discussed from the results of heat balance test. 摘要根据湘潭钢铁公司(以下简称湘钢)2号烧结机能耗现状和热平衡测试结果分析了该烧结机能耗高的原因。
- The new grinding machine passed all tests. 这台新磨床通过了所有的试验。
- Oil feeds into the machine through this tubing. 油经过这个管子流入机器。