您要查找的是不是:
- SLTC Signaling Link Test Control 信令链路测试控制
- signaling link test control 信令链测试控制
- SLTM Signaling Link Test Message 信令链路测试报文
- SLTMA Signaling Link Test Message Acknowledgement 信令链路测试通报收到
- SLTA Signaling Link Test Act 信令链路测试作用
- signaling link test message 信令锭测试消息
- Signaling Link Code = the member number within a link set. Signaling Link Code = 链路群内的成员号。
- Signaling Link Code--he member number within a link set. Signaling Link Code -- 链路群内的成员号。
- The CHG:SLK command is used to change the minor state of a signaling link. CHG:SLK 命令用于更改信令链路的次级状态。
- Major State of Link = the major equipage status of the signaling link. Major State of Link = 该信令链路的主要设备状态。
- The Administer Test Controller dialog is displayed. 随即出现“管理测试控制器”对话框。
- The device routes or switches incoming messages to an outgoing signaling link using routing information within the multitiered SS7 message. 该装置为利用多层七号信令报文中的路由信息,为进来的报文送到输出的信令链路上建立路由或进行交换。
- Signaling links are usually equipped in pairs in SS7 networks. 信令链路常常是成对地装配在 SS7 网络中。
- Load test plug-ins allow for custom load test control, such as, aborting a load test when a counter or error threshold is met. 负载测试插件允许使用自定义负载测试控件,如在达到计数器或错误阈值时中止负载测试。
- This state Indicates that the AP-DS1 is available for use by an RCS signaling link. 该状态表明 AP-DS1 可供 RCS 信令链路使用。
- A test rig is made up of a test controller and one or more agents. 测试远程测试机组由一个测试控制器和一个或多个代理组成。
- Click Close in the Administer Test Controller dialog box. 在“管理测试控制器”对话框中单击“关闭”。
- Link Node Address (Group and Member) = the node within the IMS ring on which the signaling link terminates. 链路节点地址 (Group and Member) = IMS 环路内信令链路终止的节点。
- The Administer Test Controller dialog box is displayed. 将显示“管理测试控制器”对话框。
- Signal unit initial alignment - invokes initial alignment prior to activating or restoring a signaling link. 信令单元初始定位 -- 在激活或恢复信令链路之前调用初始定位。