您要查找的是不是:
- rapid transit railways 高速铁路
- Chongqing Bus Rapid Transit Development Ltd., Co. 重庆巴士快速交通发展有限公司。
- English: Taipei Rapid Transit System Guting Station Exit 9. 中文(繁体):台北捷运古亭车站出口9。
- The government spent huge amounts of money on the mass rapid transit system. 政府为大众捷运系统花下钜资。
- Bus and rapid transit fares are certain to rise following wage settlements. 在工资问题解决之后,公共汽车和高速交通的费用肯定要上涨。
- rapid transit railway 高速铁道
- Bus rapid transit, also called BRT, is a new model of public transportation. 摘要快速公共交通(BRT)是一种新型的公共交通。
- mass rapid transit railway 高速大量运输铁路
- The Installation and Construction of the Road- bridge Transitional Section of the Rapid Transit Railway 高速铁路路桥过渡段的设置及施工
- Things that need to be done include constructing sports facilities, housing, roads, airport terminals, transit railways and telecom infrastructure and launching projects to reduce industrial pollution. 必须开工建设的项目包括体育场馆,住房,道路,机场候机楼,地铁和电信设施和减轻工业污染的工程。
- Oh, I haven't been to this city for years.Has the construction of the Rapid Transit System been completed? 哦,我很多年没来这个城市了。快运路线已经完工了吗?
- Prepare the Mass Transit Railway Services for the World Expo. 轨道交通枢纽商业要为世博会做好服务工作。
- The rapid transit system designed to link the center with outlying areas withered away from disuse. 原本设计用来把城市中心与边远区域联结起来的快速交通系统由于停止使用而破败不堪了。句子的主干是红色部分。
- Things that need to be done include constructing sports facilities,housing,roads,airport terminals,transit railways and telecom infrastructure and launching projects to reduce industrial pollution. 必须开工建设的项目包括体育场馆,住房,道路,机场候机楼,地铁和电信设施和减轻工业污染的工程。
- Safety, reliability, and flexibility are crucial factors for automatic rapid transit systems. 对于自动化快速运输系统来说,安全性、可靠性和灵活性是至关重要的因素。
- We offer AXONIS as the total systems solution for automatic rapid transit systems. 我们为自动化快速运输系统提供AXONIS整体系统解决方案。
- It depends on traffic.But why don't you use the Rapid Transit System? That'd be much cheaper and faster. 那要看交通状况。你为什么不搭快运路线去呢?那要便宜得多,也比较快。
- An important strategical goal for developing railway in our country is to realize rapid transit. 实现运输高速化是我国铁路发展的重要战略目标。
- Abstract: The Bus Rapid Transit (BRT) capacity is determined by its bottleneck stations. 摘要: 快速公交系统的通行能力是由瓶颈车站决定的。
- Schwenk, J.C., (2002).Evaluation Guidelines for Bus Rapid Transit, DOT-MA-26-7033-02, U.S.Department of Transportation. 王穆衡等人(2004),大众运输车队管理系统核心模组推广建置计画,交通部运输研究所研究计画案。