- This study reveals that the bearing capacity of rigid pile composite foundation also can be increased by post grouting technique. 因此,钻孔灌注桩的后注浆技术同样可以提高刚性桩复合地基的承载力。
- Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting. 灌注桩后压浆技术解决了桩底沉淤和桩身泥皮影响灌注桩承载力的问题,使桩底、桩侧土得到了加固,从而大幅度提高了灌注桩的承载力,降低了桩的沉降量。
- Test results show that composite foundation scheme of the post grouting CFG pile satisfies requirements of design, which proves that this scheme has good economic benefit. 检测结果表明,该后压浆CFG桩复合地基满足设计要求,具有良好的经济效益。
- The strengthening mechanism, construction technological proceedings and the main points to be noticed in construction with post grouting technique are given. 介绍了影响泥浆护壁钻孔灌注桩单桩承载力的主要因素,后压浆技术的加固机理、施工工艺流程及施工要点。
- Based on the application of post grouting technique in the rigid pile composite foundation, the authors investigated the mechanism of the capacity increase of short rigid pile by this technique. 结合后注浆技术在刚性桩复合地基工程中的应用,探讨后注浆技术提高刚性短桩承载力的作用机理。
- Tests on Post Grouting into Bored Pile in Shanghai 钻孔灌注桩后压浆技术在上海地区的试验
- rush post grouting of bored pile 冲钻孔灌注桩
- complex bored pile post grouting technique 钻孔灌注桩复式后压浆技术
- post grouting for cast-in-situ pile 灌注桩后压浆
- post grouting pile by rotary drilling 后压浆旋挖钻孔灌注桩
- He left when the band began to beat out pop music. 乐队一奏起流行音乐他就走了。
- cast-in-place pile post grouting 桩底后注浆
- The band played a military march. 乐队吹奏军队进行曲。
- A live band is always a good draw at a party. 现场演奏的乐队在聚会上总是很吸引人的。
- He was waylaid by a band of guerrillas. 他遭到游击队的狙击。
- Radio2 can be heard on the long wave band. 第二广播电台可在长波段收听到。
- The brass band is banging away in the park. 铜管乐队在公园里吹吹打打。
- He has formed a new band with his brother on bass. 他组织了一个新乐队,由他弟弟弹低音吉他。
- The application of post grouting technique in bored concrete pile 后注浆技术在灌注桩中的应用