您要查找的是不是:
- large concrete project 大体积混凝土
- There is a crane ahead that is hanging a large concrete pipe. 前面有一台吊车正在吊着一只大水泥管。
- Application of large concrete mat foundation is less interiorly. 大体积混凝土筏板基础在国内应用较少。
- Optimize the Process of Prestressed Loading on Large Concrete Flume Structure. 大型混凝土渡槽的预应力施加程序优化。
- It is agree with blueprint drew accord to manufactory requests to process the concrete project's foundation frame. 具体工程的基础框架应根据设计部门按制造厂的要求绘制的图纸加工。
- We analyze concrete’s response to alterative load and impacting load in order realize concrete project’s dynamic monitoring. 5、测试了机敏混凝土结构的动态特性,分析了机敏混凝土结构对交变载荷和冲击载荷的响应,为实现混凝土工程结构的动态检测提供了依据。
- Furthermore, this paper also elicits some disciplinary conclusions by studying the design and construction of a concrete project. 进而,通过对具体工程实例的设计施工总结得出了一些规律性的结论。
- Or ask why is the United States, Japan and other advanced countries using large concrete Shimizu, Beijing Why did people use? 或者问,为什么现在美国、日本等先进国家大量采用清水混凝土时,北京为什么就没人采用呢?
- The CIMS system that integrated management and production information, the system structure and the concrete project are introduced. 介绍了利用电子信息技术实现管理信息与生产信息集成的CIMS系统及体系结构、具体的实施方案。
- This paper analyzes the cause of large concrete crack in the construction engineering, and puts forward preventive measures. 摘要文章分析了建筑工程中大体积混凝土裂缝产生的原因,提出了预防措施。
- Large concrete footings must bear this burden as well as transverse loads from 100-mile-per-hour winds against the tank (the standard storm rating). 大型混凝土水塔的底座必须支撑这麽大的重量,同时抵挡时速160公里(标准风暴等级)的横向风力。
- Distribution power cable section is choosed economically by means of refund fixed number of year reclaim based on concrete project in order to choose perfect cable section. 结合具体工程项目,重点分析如何依据经济条件,采用偿还年限回收方法对配电电缆截面进行经济性选择,以便选出理想截面。
- Finally, it designs the concrete project of EET and discusses the effects on the country, corporation and individual separately, then puts forward several policy suggestions. 最后探讨EET模式的具体设计方案以及采用EET模式对国家、企业和个人的影响,并且给出了几点政策建议。
- This doctoral dissertation discusses the rockery part's seepage system control of large concrete dams which has always been a problem for the construction department. 本博士论文研究实际设计部门提出的大型混凝土坝岸岩绕坝渗流系统的控制问题。
- He bit off a large piece of the apple. 他咬下一大块苹果。
- Has the net friend message to hope that the vendue master can demonstrate the gold medal the picture (, because on gold medal will have concrete project name), but will be rejected. 有网友留言希望拍卖者能展示金牌的照片(因为金牌上会有具体的项目名称),但遭到拒绝。
- It's not because we need a Brobdingnagian structure we can see from the train, or because we need a large concrete boast to impress foreigners, or because the football team need a stable home. 但这并不是因为我们需要像修铁路一样大兴土木,造大人国里的工程。也不是因为我们需要这样一个值得夸耀的“大家伙”来给外国人留下印象;也不是因为国家队需要一个固定的主场。
- The variation of Cpo for various geosynthetics and fill materials is larger,hence Cpo should be determined through pull out tests for concrete projects. 不同填料、不同土工合成材料的拉拔系数相差较大,具体加筋土工程采用的拉拔系数需要通过拉拔试验确定。
- Large billboards have disfigured the scenery. 大型告示板已破坏了景色。
- Several problems existed in the preparation of standard gases are introduced detailed,and concrete projects to solve these problems are put forward. 详细介绍了我国标准气体制备过程中存在的诸多问题,对如何解决这些问题提出了具体方案。