- In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam. 结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
- The concrete face rockfill dam of Lianhua Hydropower Station is the first large scale face rockfill dam in the cold region in China at present. 莲花水电站建设的混凝土面板堆石坝,是目前我国在寒冷地区修建的第一座大型面板堆石坝。
- Although there is only few experiments were applied, the structural design of overflow concrete face rockfill dam is chosen as the purpose of the dissertation. 因此本文选择溢流混凝土面板堆石坝的结构设计作为研究内容。
- Concrete face rockfill dam has been built for many hydropower stations in recent years for face concrete has less cost and can be built with local materials. 近年来,混凝土面板堆石坝在水电站工程中应用较广,采用面板混凝土技术具有投资省、就地取材等优点。
- Based on calculated finite element deformation results of Chahanwusu, the key technology of concrete face rockfill dam built on thick alluvium deposits is summarized. 摘要以察汗乌苏面板堆石坝有限元法应力变形计算结果为基础,总结了在深覆盖层地基上建造的面板堆石坝的关键技术。
- The stress-deformation behavior of diaphragm walls of concrete face rockfill dam built on thick alluvium deposit was analyzed using the numerical analysis method. 摘要采用数值分析方法对深覆盖层上混凝土面板堆石坝的防渗墙应力变形性状进行了研究。
- Transient seepage analyses for Gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory. 摘要利用非饱和土渗流理论,对沟后混凝土面板砂砾石坝进行瞬态渗流数值模拟。
- The construction of upstream slope of cushion materials of faced rockfill dam is one of key construction items. 摘要面板堆石坝垫层料上游坡面施工是一项关键项目。
- Design of Gongboxia Concrete Face Rockfill Dam 公伯峡水电站混凝土面板堆石坝设计
- Creep analysis of high concrete face rockfill dam 高混凝土面板坝流变分析
- Study on Rheology of Concrete Face Rockfill Dam 混凝土面板堆石坝流变研究
- concrete face rockfill dam (CFRD) 混凝土面板堆石坝
- high concrete face rockfill dam (CFRD) 高面板堆石坝
- CFRD(Concrete Face Rockfill Dam) 混凝土面板堆石坝
- The damming technology of concrete face rockfill dams is a significant technologyachievement in the field of modern damengineering construction. 混凝土面板堆石坝筑坝技术是现代坝工建设领域取得的一项具有重大意义的技术成就。
- concrete face rockfill dam(CFRD) 混凝土面板堆石坝
- Whether the natural sand gravel stratum in the river bed would serve as the foundation of the superhigh faced rockfill dam or not was one of the key technical problems of the project. 河床天然砂卵砾石层能否作为超高面板坝坝基是该工程的关键技术问题之一。
- An introduction was given to the application of composite geomembrane to construction of a concrete faced rockfill dam and to strengthening of a dangerous reservoir in severe cold area of Xinjiang. 介绍了复合土工膜在新疆严寒地区土工膜防渗面板堆石坝和病险水库加固中的应用。
- Water Resources and Hydropower Planning and Design General Institute ,MWR, Design code for concrete face rockfill dams (SL228-98) ,Beijing:China Water Resources and Hydropower Publishing House,1999. [2]水利部水利水电规划设计总院.;SL228-98[S]
- Toe slab design of Heiquan concrete face rockfill dam 黑泉面板坝趾板设计