您要查找的是不是:
- 运行确认OQ operational qualification
- 15 GHz 的VLBI观测发现在两个微瓣之间存在一个微弱的核,从而确认OQ 208 为致密对称源(CSO)。 The 15 GHz VLBI observations discovered a weak core located between the two mini-lobes and confirmed that OQ 208 is a CSO(Compact Structure Object).
- 确认 verify
- 运行确认 OQ
- 第一次运行确认安装测试可能需要几分钟。 Running a verification installation test for the first time may take several minutes.
- 性能确认(PQ)应该在安装确认和运行确认成功完成的基础上进行。 Performance qualification (PQ) should follow successful completion of Installation qualification and Operational qualification.
- 尽管PQ被描述为一个独立的活动,但是在某些情况下它会与OQ结合起来。 Although PQ is described as a separate activity, it may in some cases be appropriate to perform it in conjunction with OQ.
- 试运行 preoperation
- 运行时间 runtime
- 正常运行 good running
- 再次确认 reconfirm
- 再确认 cross-check
- 运行状况 operational state
- 确认书 letter of confirmation
- 运行环境 operating ambient
- 请确认 PLSCONFM; please confirm
- 运行情况 operational aspect
- 确认的 established
- 运行状态 running state
- 确认函 confirmation