您要查找的是不是:
- A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension. 贯穿填土坝、水力冲填坝或坝基的一个细小的漏水孔隙以悬浮的方式带走一些细小的土粒。
- An example of applying FBI method in a zoned earth-rock fill dam construction in Japan is also provided in the paper. 最后, 本文还介绍了该技术在一座土石坝心墙材料施工管理中的应用实例。
- LU Ting-hao,GAO Gui-quan,CHEN Jian.Effective stress method of stress and deformation for soil-rock fill dam after water impounding[J].Rock and Soil Mechanics,2005,26(2):247-250. [5]卢廷浩;高贵全;陈剑.;蓄水后土石坝应力变形有效应力算法[J]
- Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe. 水力冲填坝通常是用一根管子利用水流把砂和粉沙运到坝体处筑坝。
- A point that Majiatian tailings fill dam might induce earthquake and rainfall water might result in declination of shear strength of tailings sand soil once the reservoir is closed has been put forward. 并初步提出了马家田尾矿库可能会诱发地震和封库停运后大气降雨会导致坝体尾矿砂土抗剪强度降低的观点。
- In the construction of Bowagou hydraulic fill dam in Dingxi County of Gansu Province,for lack of sand and stone materials,it had gained better effect to drain water through corrugated polyethylene pipe net. 在沙石料缺乏的甘肃省定西县播山沟水坠坝施工中,采用聚乙烯微孔波纹管网进行坝体排水,取得良好的效果。
- The measurement of actual works also explained that the use of compound geotextile in rock fill dam surface can reduce the amount of leakage water by 60%, the effects of imperviousness are obvious. 此外,实际工程观测也说明,砌石坝构筑复合土工膜坝面防渗体后,漏水量减少了60%25,防渗效果良好。
- The authors introduced in detail the filling and placement construction technique, method and quality controlling of the Heiquans concrete-sand-gravel fill dam with faceplate. 详细阐述了黑泉混凝土面板堆砂砾石坝填筑施工技术、施工方法以及工程质量的控制。
- Thought and norm of dry fill dam design 干硬填筑坝的设计思想与设计准则
- Experimental study on hydraulic fill dam technology 水力冲填筑坝技术试验研究
- rock fill dam with concrete face slab 混凝土面板堆石坝
- rock fill dam with gravel-soil core 砾石土心墙堆石坝
- earth-rock fill dam with clay core 粘土心墙土石坝
- Siping Concrete Face Sand-Gravel Fill Dam 寺坪混凝土面板砂砾石坝
- Abstract : After June 2000, there were piezometric level abnormity occurred in piezometer tubes 1140-1 of left-bank earth-rock filled dam of Danjiangkou hydro-junction. 摘 要 :2000年6月以来,丹江口水利枢纽左岸土石坝“1140-1上”测压管水位出现异常。
- It took me quite a while to fill out the questionnaire. 填写那份问卷花了我好长一段时间。
- Fill your radiator with water, or your engine will overheat. 给你的散热器充水,否则引擎会过热。
- strengthening of earth-rock fill dam 土石坝加固
- Don't let defeat fill you with gloom. 别让失败使你灰心丧气。
- The BBC often plays a record to fill in. 英国广播公司经常在节目空档时播放唱片。