您要查找的是不是:
- rated load operation 额定负荷运行
- Specify a time-out for the bulk load operation. 指定大容量加载操作的超时值。
- Total current distortion not higher than 5% at rated load. 目前共有失真不高于5%25额定负荷。
- Acquire a table-level lock for the duration of the bulk load operation. 在大容量加载操作期间获取表级锁。
- The electric tractor possesses comparatively strong anti-overloading capacity;the maximum bearable suddenly added load, while under the normal operation, could reach 1.6 times of the rated load. 电动拖拉机具有较强的抗过载能力,正常作业时能够承受的最大突加载荷可达到额定载荷的1.;6倍;
- Since the high power factor is 99% or higher (at rated load), the power capacity can be greatly reduced. 由于高功率因数是99%25以上(额定负荷),电力容量可大为减少。
- Do not execute insert triggers defined on the destination table during the bulk load operation. 在大容量加载操作过程中,不要执行在目标表上定义的插入触发器。
- Reporter in that must pay $600, and doing must reach the rated load and quality assurance. 记者在一旁获悉,需交纳600元加盟费,而且必须达到额定工作量并保证质量。
- This action value varies, depending on the state of the row before the load operation. 该操作值会根据加载操作之前的行状态相应地变化。
- Execute insert triggers defined on the destination table during the bulk load operation. 在大容量加载操作过程中,执行对目标表定义的插入触发器。
- A system is introduced, which can on-line monitor and diagnose the transformer at rated load and make no influence to its performance and life. 介绍一种不影响变压器在满载状态下运行性能、命的在线监测、断系统。
- Specify the maximum number of errors allowed before the bulk load operation is canceled. 指定在大容量加载操作取消之前允许的最大错误数。
- When indexes exist on a table, you cannot perform a parallel load operation by using the TABLOCK option. 如果表有索引,则不能通过使用TABLOCK选项来执行并行加载操作。
- The rated load changes according to the boom length and angle, including the weights of the hanging hook's pulley and the cable. 总额定负荷随起重臂的长度和角度而变化,包括吊钩滑轮与钢丝绳的重量。
- Is to reduce fuel consumption and limit problems caused by light load operation of reciprocating diesel generator sets. 负载需求是并联系统的一种运行模式,系统监控发电机组总的输出功率,根据系统总负载量决定运行机组的数量。负载需求控制的目的是降低。
- Isochronous load sharing, kW droop, and base load operation can be provided. Learn more from 2300G product spec 03338. 同步负载共享,千瓦下垂,和相应的负荷运行可以提供。
- ABUS LIS overload protection. Lifting is interrupted when1,1 times rated load is reached. The electronic measurement method used features extremely short load detection times. 安博lis过载保护装置。该装置当载荷超过额定载荷的1.;1倍时中止葫芦起升。该装置检测时间短。
- Starting main air machine ,noticing observation the dust-precipitator circumstance of no load operation . 起动主风机,注意观察除尘器空载运行的工作情况。
- Specifies that a bulk update table-level lock is acquired for the duration of the bulk load operation; otherwise, a row-level lock is acquired. 指定在大容量加载操作期间获取大容量更新表级别的锁;否则,获取行级别的锁。
- The dry-pit submersible motors shall be of an air-filled design and shall be suitable for continuous full load operation. 干井潜水电机应该是风冷的,并且适合连续全负荷运转。