您要查找的是不是:
- Concrete face slabs are constructed in two stages with railless slipforms. 混凝土面板施工分两期,采用无轨滑模。
- Bituminous concrete facings for earth and rockfill. 土石坝的沥青混凝土面层。
- Applying the next option Image -Adjustments -Selective Color, it possible to correct a little the face layer colors. 回到脸肉肉图层下点击图像-调整-可选颜色将脸脸的颜色修正一下。
- Applying the next option Image -Adjustments -Selective Color , it possible to correct a little the face layer colors. 回到脸肉肉图层下点击图像-调整-可选颜色将脸脸的颜色修正一下。参数如下:
- In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam. 结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
- The crushing side wall is used the upstream consolidation slope measures of rockfill dam with concrete face slab. 混凝土面板堆石坝采用挤压边墙作为大坝上游固坡措施。
- A example was given by using the face-back-changing weave in the last, explained how to change face layer and back layer to construct the simulating unit matric. 以表里换层组织的模拟方法为例,探讨了在计算机模拟中,表里换层的实现方法。
- The concrete face rockfill dam of Lianhua Hydropower Station is the first large scale face rockfill dam in the cold region in China at present. 莲花水电站建设的混凝土面板堆石坝,是目前我国在寒冷地区修建的第一座大型面板堆石坝。
- With the development of concrete face slab dam, the upstream slope construction is a key factor affecting the schedule and quality of construction. 在混凝土面板坝的发展过程中,上游坡面的施工始终是一个控制进度和影响质量的关键环节。
- The paper introduces the concrete face slab fissures and defects in Xiaoshan hydropower station as well as its repairing material and method. 文章详细介绍了小山水电站面板混凝土裂缝与缺陷修补加固用材料、修补加固方法。
- The first concrete face and its strengthening face are destroyed by the inverse seepage water pressure on dam foundation. 大坝一期混凝土面板和一期面板的补强面板分别遭受坝基反渗水压力的破坏。
- Curtain grouting engineering program and method for concrete face rock-fill dam at Dongba Hydropower Station are presented in this paper. 摘要介绍洞巴水电站混凝土面板堆石坝帷幕灌浆施工方案及具体成功的施工方法。
- Through model tests of a sloping soil dyke in a tidal flume, the stability of the concrete face plate under the action of tide is analyzed. 通过潮浪水槽中的斜坡式土堤模型试验,分析了涌潮作用下混凝土护面板的稳定性。
- The damming technology of concrete face rockfill dams is a significant technologyachievement in the field of modern damengineering construction. 混凝土面板堆石坝筑坝技术是现代坝工建设领域取得的一项具有重大意义的技术成就。
- The pressure quality control of the pitch concrete road surface 沥青混凝土路面压实施工的质量控制
- She has keyed the piano up to concert pitch. 她已经把钢琴的音调升到音乐会的音高标准。
- The runner went to second base on a wild pitch. 一记瞎设让跑垒员跑上了第二垒。
- Although there is only few experiments were applied, the structural design of overflow concrete face rockfill dam is chosen as the purpose of the dissertation. 因此本文选择溢流混凝土面板堆石坝的结构设计作为研究内容。
- Construction Technology on Expressway Pitch Concrete Face-layer 高速公路沥青混凝土面层施工技术
- A drying and reconditioning experiment was done of the beech lumber used for face layers in 3-layer parquets. 本文介绍对三层实木复合地板的表板用材山毛榉进行的干燥和养生试验。