您要查找的是不是:
- Program commissioning and technical service on site. 现场程序调试及技术服务。
- Sustain fixing and test run on site, and analyst and manage electric troubles. 支持现场安装调试电气设备,分析处理现场故障。
- Free training shall be provided on site for whole installation and commissioning period. 安装调试期间免费提供技术咨询、现场服务指导、培训。
- How many operational processes on site? 现场有多少操作流程?
- Name of person-in-charge on site Mobile Phone no. 现场负责人姓名:手提电话号码
- Metal airproofed and steam sterilization on site. 金属密封可在位蒸汽灭菌。
- Is There A Metal Detector On Site? 是否有金属探测仪器?
- Quality control and analysis on site. 现场质量控制及分析。
- A: Are there laundry facilities on site? 请问公寓内有洗衣设备吗?
- Protective helmets must be worn on site. 在工地必须戴防护帽。
- Capability of system application, design verification, site commissioning, engine calibration, vehicle calibration. 有能力进行系统应用设计,设计验证,现场试车,发动机标定以及车辆标定。
- Check the goods on site, to meet BCD's requirement. 驻厂检验中,代表公司与供应商进行沟通。
- Documentation (turnover packages, daily log entry, inspection reports, startup and commissioning test forms, etc) for all startup and commissioning activities. 所有启动和调试活动的文件(文件转交,每日日志,检测报告,启动和调试调试试验表等)
- On site equipment trouble shooting &repair. 现场检修设备,排除故障;
- Around an hour later we were back on site. 大约一小时后,我们回到了场地。
- Virtual as well as On Site bilingual Consultation. 虚拟及现场的技术咨询与指导。
- Physical startup and physical commissioning test of CANDU 6 during commissioning are primarily performed at Phases B and C, and critical monitoring after fuel loading at PHASE A is also included. CANDU6堆调试期间的物理启动和物理调试试验主要在B阶段和C阶段进行,同时也包括A阶段的堆芯装料后的临界监督。
- Full use should be made of any exposures available on site. 应该充分利用现场可以利用的任何一个露头。
- Some experiences of the mill retrofit including equipment import,non-standard sets complement and commissioning test run in Guangzhou Paper Mill recent yeare are summarized in this paper. 结合近年来从事企业技术改造工作的实例,总结了从设备引进、非标配套、新老系统或设备的衔接,直到实物试车全过程的一些经验、教训和体会。
- Core splitting and sample preparation is done on site. 岩心的截劈和样品的制备是在当地完成的。