您要查找的是不是:
- Objective: To observe the clinical effect of implant placement simultaneous nasal floor elevation. 目的:观察鼻底提升与种植体同期植入后的临床效果。
- Methods: To observe the respond of nasal vestibular?new bone around implant after implant placement simultaneous nasal floor elevation. 方法:鼻底提升与种植体同期植入后,观察鼻前庭的反应、种植体周新骨的形成。
- Results: It showed well new osseointegration around implants and there were no clinical complaintsof the nasal sinus after nasal floor elevation. 结果:患者鼻音没有改变、鼻前庭无不适反应、种植体周新骨形成良好。
- Conclusion: The data suggests the implant placement simultaneous nose floor elevation be a better way to restore the type of Kenned. 目的:观察鼻底提升与种植体同期植入后的临床效果。
- The maxillary sinus floor elevation is the effective way to resolve the inadequate bone height in the posterior region of the maxilla in order to promote stability of endosseous implants. 上颌窦底提升是有效解决上颌骨后部骨量不足的方法之一,能为后期种植体的成功植入提供保证。
- Methods: Three-dimensional finite element was adopted to compare stress and displacement on osteotome-bone interface at the different shapes of top osteotomes top at osteotome sinus floor elevation. 方法:采用三维有限元方法比较骨挤压上颌窦提升术当骨挤压器顶端不同形状时,骨挤压器-骨组织界面的应力和位移情况。
- Don't scrape your feet on the floor. 别用脚蹭著地板。
- The tables are firmly fixed to the floor. 桌子都牢牢地固定在地板上。
- Floor elevation control in highway bridge construction 公路桥梁施工中桥面标高的控制问题
- Drawings of power distribution system and floor elevation profile; 配电系统图和楼层标高剖面图:下图;
- Keywords Dental implantion;Sinus floor elevation;Osteotome; 牙种植;上颌窦底提升;骨挤压;
- The book hit the floor with a thud. 这书砰的一声落在地板上。
- The house is at an elevation of 1000 meters. 这所房子在海拔1000米处。
- The gun has an elevation of 45 degrees. 这门炮的仰角为45度。
- He canted over from his chair onto the floor. 他从椅子上跌倒在地板上。
- He fell on the floor with an awful whomp. 他摔在地板上发出一声可怕的撞击声。
- He wiped up the spilt milk on the wooden floor. 他揩掉了泼在地板上的牛奶。
- This paper introduced the trapezoid diagram design and also made the experimental model of modern elevator control device controlled by PLC.The model provided the control for a five floor elevator. 摘要介绍了用梯形图设计并制作了用可编程控制器(PLC)控制的现代电梯控制装置的实验模型。
- The city is at an elevation of 2000 metres. 这座城市海拔2000米。
- Their clothes lay in a huddle on the floor. 他们的衣服杂乱地堆在地板上。