a technique that is often used for subway construction is the cut-and-cover method. Workers excavate a trench, inside of which the lining for the tunnel is built. It is then covered over with the earth or other fill that was originally removed.
英
美
释义
隧道挖填施工法经常用于地铁建设。工人们开挖一条壕沟,在沟内砌好隧道的衬砌,然后用土覆盖,或用最初挖出的土石方回填。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载