You must address the major technical, business, and programmatic risks as early as possible, rather than postponing risk resolution toward the end of the project.
英
美
释义
你必须尽可能早地指出主要技术,业务和编程风险,而不是把风险的解决推迟到项目的最后。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载