With regards to the difficulties in Forcasting and controlling ore throw in draw hole, consolidation of the ore-surge bin and endwall of crusher chamber has been under consideration and conduction.
英
美
释义
针对溜井中跑矿难以准确预测和控制,对缓冲料仓及破碎机峒室端墙进行加固。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载