Where field joints are required in the case of tubing bundles crossing structural splice lines, the tubing shall be cut at each terminating end to prevent damage during installation.
英
美
释义
如果导压管管束经过结构拼接管线要求使用现场接头,应在每个终端切割导压管和防止在安装期间收到损坏。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载