When the construction project is to be put into operation or use, their flood control works should pass the acceptance by the water conservancy administrative department.
英
美
释义
建设项目投入生产或者使用时,其防洪工程设施应当经水行政主管部门验收。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载