Verification shall be performed in accordance with planned arrangements (see 7.3.1) to ensure that the design and development outputs have met the design and development input requirements.
英
美
释义
设计与开发的验证应依规划的安排执行(见7.;3
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载