To solve strata pressure control of shallow coal seam with thick sand and thin bedrock, in-situ observation was carried out in Baoshan mine 6101 fully mechanized coalface, which is the first coalface.
英
美
释义
摘要为解决厚砂层薄基岩浅埋煤层矿压控制问题,对宝山煤矿6101综采工作面(首采)进行现场实测。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载