海词手机词典
  • This paper introduces technological parameters and flowsheet of the desig- ning,the selection of main equipment and operative condition for a fume clea- ning system on a 6000kVA ferrosilicon furnace,The problems existing in start -up period are discussed.

    播放读音 播放读音