Then, we consider an n-job, m-machine lot streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness.
英
美
释义
接著,我们考虑一个在n件工件及m部机器下,批量流在流程型工厂之排程问题,其目标是最小化总加权提早及延迟时间。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载