The second-phase of the project is a newly building section with whole length of 21 km, which will link up Sahe and Xiaosigou station in Chengde city.
英
美
释义
二期工程为新建路段,连接洒河至承德小寺沟车站,全长21公里。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载