The scheduling problem for one and two hoists is different, the latter involves overlapping and cannot be solved directly by means of mathematical modeling.
英
美
释义
单抓钩排序问题不同于两抓钩排序问题,后者包括了有重叠区的情况,并且,无法用数学模型直接求解。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载