The rock formation of the foundation of the covered culverts at the west No.4 ring road in Beijing section of the Middle Alignment of the South-North Water Transfer Project was sand and gravel.
英
美
释义
摘要南水北调中线北京段西四环暗涵为砂砾(卵)石地层,采取浅埋暗挖法施工。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载