海词手机词典
  • The project of Xixiaoping Bridge(DK107+921.80) was chosen as pre-stress concrete continuous box girder bridge,whose span is 48 m+80 m+48 m. As the bridge located in the seismic area of 7 degree,the seismic design should be made.

    播放读音 播放读音