海词手机词典
  • The paper analyzes problem existed in reactor and reason from 10kV side parallel connection reactor of 1 # main transformer in 330kV Alan Substation,changes all reactors which have fault,ensures safe and stable running to QingHai electric power system.

    播放读音 播放读音