The model analysis method of the thermal parameters feedback during the construction period of RCC dam was set up, which was based on the method of artificial neural network.
英
美
释义
摘要基于人工神经网络的方法,建立了碾压混凝土坝施工期热学参数反馈分析模型。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载