The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.
英
美
释义
建设项目中防治水污染的设施,必须与主体工程同时设计,同时施工,同时投产使用。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载