The engineering practice proves that after the foundation is consolidated by mortar pouring into pipe, pipe-jacking course is about the same as that in the original gobi desert soil without groundwater, and the desired result is achieved.
英
美
释义
实践证明,基础经小导管注浆加固处理后,其顶进过程与原状、地下水戈壁土的基本相同,达到了预期的目的。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载