The deflection of precast piles and excavation problems induced by pile driving are introduced through an engineering case of pile foundation treatment of a power plant.
英
美
释义
通过某电厂桩基处理工程实例,介绍了打桩引起的预制桩偏位及开挖问题。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载