The continuous prestressed beam was constructed with cantilever construction,this construction was high of technology,so the bridge was supervised and controlled in the whole construction.
英
美
释义
预应力混凝土连续梁桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行施工控制。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载