The Shuibuya hydroelectric project will be built in gorge morphology on Qingjang River,the gravitation is key factor which decides whether the rock in dam site is stable or not.
英
美
释义
水布垭水电枢纽拟建于清江干流深切峡谷地段,重力是决定坝址区岩体稳定与否的关键因素。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载