Temperature Control on Side Wall Concrete Construction in the Sixth Lock Head of the Permanent Navigation Locks at the Three Gorges Project during Hot Season
英
美
释义
三峡工程永久船闸六闸首边墙混凝土高温季节的施工温控
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载