Secondly the paper explains how to establish the cost counting system with ABC (Activity-Based Costing) and the cost analysis system with ABM (Activity-Based Management).
英
美
释义
其次建立以作业成本计算(ABC)为基础的成本计算系统,以作业管理(ABM)为基础的成本分析系统;
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载