Presedimentation basins are constructed in excavated ground or out of steel or concrete: Steel and concrete tanks are often equipped with a continuous mechanical sludge removal apparatus.
英
美
释义
预沉池挖掘建造于地下或由钢筋混凝土制成。钢筋混凝土的沉淀池通常装有机械排泥装置。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载