On this event, the Party responsible for the delays (Seller in delivery or Buyer in unloading) will have to bear the costs for the extension of the validity of the Letter of Credit as well as the costs of storage in the Port of Loading.
英
美
释义
如延长,承担延迟责任的一方(卖方因交付或买方因卸货)必须承担延长信用证有效期和存储在装货港的费用。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载