On the basis of the results obtained from numerical simulation, the sizes of room stope and pillar slope and the material ratio for cemented tailings backfilling have been optimized and determined.
英
美
释义
根据计算结果,优化确定了尾砂胶结充填体的配比及采场矿房矿柱的尺寸。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载