Note: All equipment including Tubing, Crossovers, Tubing Hangers should be dimensionally inspected and subassemblies pressure tested prior to running in the well.
英
美
释义
注:在将油管下入井中之前,应当对所有设备,包括油管、变扣接头、油管挂,进行尺寸检查,并对工具总成进行试压。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载