New Austrian tunneling method was adopted for the primary support,secondary permanent lining and grouting treatment,and the convergence survey was performed after the primary support.
英
美
释义
对此类围岩采用“新奥法”施工方法,即一次支护,二次永久衬砌施工和灌浆处理,并在一次支护完成后进行了收敛量测。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载