Manufacturing cost is high because be formed in cost,be in take makings of macrocephalic iron and steel and the sources of energy use up tall.
英
美
释义
生产成本高是由于在成本构成中占大头的钢铁料和能源的消耗高。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载