Load bearing is allowed only 24 hours after the floor laying is completed, and, it is necessary to keep the indoor air circulating.
英
美
释义
地板铺设完毕后,在24小时后方可承重并要经常保持室内空气的流通。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载