In view of very large scale of Y-pipes of this project, the design of combined bearing of Y-pipe and surrounding rock is adopted to decrease the difficulty of fabrication and erection.
英
美
释义
摘要西龙抽水蓄能电站岔管规模远超过国内已建工程,为降低制作、安装难度,考虑岔管与围岩联合受力设计。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载