In the light of the defects arising in construction of Pile No. 32-5 of the Shengmi Bridge, this paper focuses on the causes, handling schemes, handling by grout injecting of the defects as well as re-inspecting of the pile having been handled.
英
美
释义
摘要针对生米大桥32-5号桩出现缺陷的问题,著重介绍缺陷产生的成因、处理方案、压浆处理的实施以及复检情况。