In the closed circulation system of ash-sluicing water of coal-fired power plant,the scaling of the hydraulic ash transport pipes and the backwater pipes is the main problem that need to be solved.
英
美
释义
在燃煤电厂冲灰水闭路循环系统中,水力输灰管和回水管的结垢是所需解决的主要问题。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载