In addition, the monitoring design and finalisation of monitoring solution and program were carried based on site geological conditions, and characteristics and requirements of this project.
英
美
释义
此外,根据场地工程地质条件,以及本工程的特点及要求,进行基坑开挖监测方案的设计,选择确定合理的基坑开挖监测方案。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载