If the Principal is needed to handle, the Contractor shall bear all costs arising from this, including but not limited to retaining fee, translation fee and survey fee arising from handling disputes.
英
美
释义
若需要发包人处理的,承包人应承担由此而引起的全部费用,包括但不限于因处理纠纷而引起的律师费、翻译费和鉴定费等。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载