If the Contractor does not so give notice to the Engineer within 14 days after being requested to examine the records, they shall be accepted as accurate.
英
美
释义
如果承包商在被要求对记录进行审查后14天内未向工程师发出此类通知,则认为它们是准确的并被接受。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载