However, scouring in different degrees has occurred downstream the spillway and the release runnel.In the light of this situation, a revetment has been designed and constructed.
英
美
释义
为此,针对泄洪洞和溢洪道出口下游冲刷流态等实际情况,进行了护岸工程的设计和施工。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载