During the construction of the railway subgrade of Harbin-Dalian passenger railway line, there is a serious shortage in fill materials for railway subgrade in some sections.
英
美
释义
摘要在哈大铁路客运专线路基施工中,有的路段路基填料十分匮乏,需要寻找满足设计及规范要求且价格相对便宜的土料。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载