Due to the tight design term, the basic information is not complete and the scheme is changed repeatedly, it is hard to the design with quality assurance completely.
英
美
释义
摘要由于项目设计工期紧、基础资料不齐全、方案反复变化等因素,给保质保量完成设计任务带来了一定困难。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载